Linhai 2004 ATV 260 Service Manual page 254

Linhai atv 2004-2005, 2009
Table of Contents

Advertisement

CHAPTER 5 FINAL DRIVE
ATV SERVICE MANUAL 09.0
8. Install hub.
9. Install bearing 30205 on spindle.
10. Install washer and spindle nut. Torque
spindle nut to 160-170 inch lbs (18-19N.m),
while rotating hub continuously, back off nut
1/2 turn, and rotate the hub several turns.
Re-torque spindle nut to 110-140 inch lbs
CHAPTER 5
FINAL DRIVE. 5-
7

Advertisement

Table of Contents
loading

Table of Contents