Reboot - Black Box 12-Port 1000BASE-TX L2 Managed PoE Switch User Manual

With 2 sfpdual media ports
Table of Contents

Advertisement

12-Port 1000BASE-TX L2 Managed PoE Switch with 2 SFP Dual Media Ports
Then, press Upgrade button if your download is not successful, the switch will also be back to "Software
Upgrade", and it will not upgrade the software as well.
When download is completed, the switch starts upgrading software. A reboot message will be prompted after
completing upgrading software. At this time, you must reboot the switch to have new software worked.
Software upgrade is hazardous if power is off. You must do it carefully.
Parameter
TFTP Server
Path and Filename

4.24 Reboot

We offer you many ways to reboot the switch, including power up, hardware reset and software reset. You can
press the RESET button in the front panel to reset the switch. After upgrading software, changing IP
configuration or changing VLAN mode configuration, then you must reboot to have the new configuration
taken effect. Here we are discussing is software reset for the reboot in the main menu.
Reboot the switch. Reboot takes the same effect as the RESET button on the front panel of the switch. It will
take around thirty (30) seconds to complete the system boot.
Parameter
Save and Reboot
Reboot
88
NOTE
Table 4-55. Firmware Upgrade screen options.
Description
A TFTP server stored the image file you want to upgrade.
File path and filename stored the image file you want to upgrade.
Table 4-56. Reboot screen options.
Description
Save the current settings as start configuration before rebooting
the switch.
Reboot the system directly.

Advertisement

Table of Contents
loading

Table of Contents