Installation Workflow - Nomadix Access Gateways User Manual

Access gateway
Table of Contents

Advertisement

A
G
CCESS
ATEWAY

Installation Workflow

The following flowchart illustrates the steps that are required to install and configure your
Access Gateway successfully. Review the installation workflow before attempting to install
the Access Gateway on the customer's network.
Place the AG on a flat and stable work surface and connect the power cord.
Connect the AG to a "live" network. Use the DB9 serial cable (6 ft. length)
Start a HyperTerminal session to communicate with the AG via the serial port.
When prompted, accept to the Nomadix End User License Agreement (EULA). You
must accept the EULA before the AG can connect with the Nomadix License Key
Server. When the key is successfully received from the server, your AG will reboot.
You can now power down and connect the AG to the customer's network.
Network
Power up the AG and log in via a Telnet session or the Web Management Interface.
Installing the Access Gateway
between the AG's serial port and your computer.
Power up your computer and turn on the AG.
Log in to the Command Line Interface.
When prompted, configure your AG's IP, DNS, and Location
settings. The AG will then prompt you to reboot the system.
Connect the AG to the customer's network.
Set the basic configuration parameters for subscribers.
The AG is now ready for administrators to add, delete, or
change unique subscriber profiles.
Export your configuration settings to an archive file.
27

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Access Gateways and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Ag 2300Ag 3100Ag 5500Ag5600

Table of Contents