Installation Workflow - Nomadix AG 5000 User Manual

Access gateways
Table of Contents

Advertisement

AG 5000

Installation Workflow

The following flowchart illustrates the steps that are required to install and configure
your AG 5000 successfully. Review the installation workflow before attempting to
install the AG 5000 on the customer's network.
Place the AG 5000 on a flat and stable work surface and connect the power cord.
Connect the AG 5000 to a "live" network. Use the DB9 serial cable (6 ft.
length) between the AG 5000's serial port and your computer.
Power up your computer and turn on the AG 5000.
Start a HyperTerminal session to communicate with the AG 5000 via the serial port.
When prompted, configure your AG 5000's IP, DNS, and Location
settings. The AG 5000 will then prompt you to reboot the system.
When prompted, accept to the Nomadix End User License Agreement (EULA). You must
accept the EULA before the AG 5000 can connect with the Nomadix License Key Server.
When the key is successfully received from the server, your AG 5000 will reboot. You can
now power down and connect the AG 5000 to the customer's network.
Network
Connect the AG 5000 to the customer's network.
Power up the AG 5000 and log in via a Telnet session or the Web Management Interface.
Set the basic configuration parameters for subscribers.
The AG 5000 is now ready for administrators to add, delete,
Export your configuration settings to an archive file.
Installing the AG 5000
Log in to the Command Line Interface.
or change unique subscriber profiles.
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents