Top Cable - BodyCraft K2 Instruction Manual

Gym strength training system
Hide thumbs Also See for K2:
Table of Contents

Advertisement

Assemble cables and pulleys simultaneously.
1. Insert the threaded end of the Top Cable (57) into the slot in the front of the Top Frame (4) as shown in
inset T1, and insert a pulley into the slot using one 3/8" X 2-1/2" Hex Bolt (133), two 3/8" Washers
(152) and one 3/8" Nut (159). Route the cable over this pulley, through the Top Frame (4) and over the
pulley mounted (using one 3/8" X 2-1/2" Hex Bolt (133), two 3/8" Washers (152) and one 3/8" Nut
(159) in the rear of the Top Frame as shown in inset T2.
2. Mount a pulley in the top hole of one Floating Pulley Block (42) using one 3/8" X 1-3/4" Hex Bolt (134)
and one 3/8" Nut (159). Continue cable routing down and around the top pulley in the Floating Pulley
Block (42) as shown in inset T3, T5.
3. Continue cable routing up and over the left side (as if sitting on seat) pulley mounted on Top Frame (4)
as shown in inset T4. Use one 3/8" X 2-3/4" Hex Bolt (132) and one 3/8" Nut (159) to mount the
pulley.
4. Mount a pulley in the top hole of the other Floating Pulley Block (42) using one 3/8" X 1-3/4" Hex Bolt
(134) and one 3/8" Nut (159). Continue cable routing down and around the top pulley in the Floating
Pulley Block (42) as shown in inset T3, T5.
5. Continue cable routing up and over the pulley mounted on the Top Guide Rod Retainer as shown in
T6. Mount the pulley using one 3/8" X 1-3/4" Hex Bolt (134) and one 3/8" Nut (159). Screw the
threaded end of the Top Cable (57) into the Top Plate (49). The bolt should be at least one-third of the
way screwed in.
STEP 7

TOP CABLE (57)

Ball with hook end
T1
T3
Top Cable
T2
T4
T1
T6
133
T5
T2
133
T3,T5
T7
13
Bolt end
152
4
4
132
152 159
92
92
T4
T6
4
159
152
159
152
92
T7
159
42
134
92
159
92
17
134
92
57
49
50

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents