Page 1
Please call your local dealer for assistance or BodyCraft at 800-990-5556 (9:00 AM - 5:00 PM). Our trained technicians will provide immediate assistance to you, free of charge.
7. Make certain all cables are seated within the pulleys before every use. 8. Exercise with care to avoid injury. 9. If unsure about the proper use of the BODYCRAFT PFT CABLE GYM strength training system call your local BODYCRAFT dealer or our...
PARTS LIST NO. DESCRIPTION QTY. RIGHT MAIN UPRIGHT LEFT MAIN UPRIGHT GUIDE ROD CABLE ADJUSTING CONNECTOR RIGHT HEIGHT TRACK (pre-assembled) LEFT HEIGHT TRACK (pre-assembled) CHIP UP BAR MID CROSS CONNECTOR TOP GUIDE ROD HOLDER CABLE HEIGHT ADJUSTER ASSEMBLY REVOLVING CABLE BRACKET PULLEY BLOCK PULLEY GUIDE BRACKET CAP (pre-assembled)
Page 6
PARTS LIST NO. DESCRIPTION QTY. STEEL SHAFT SHAFT SPRING ADJUSTER SPRING PLASTIC STUDS C PIN 1/2" X 6" HEX BOLT 3/8" X 3-1/4" HEX BOLT 3/8" X 2-1/2" HEX BOLT 3/8" X 2" HEX BOLT 3/8" X 3/4" ROUND SET SCREW TOP PLATE BOLT 3/8"...
Page 7
STEP 1 ASSEMBLE MAIN UPRIGHT Assembly requires two people. Do NOT attempt assembly by yourself. Carefully unpack the pieces and lay them on the floor near the location you plane to use this machine. Professional installers are highly recommended. To ease assembly, DO NOT tighten any bolts until instructed. 1.
Page 8
STEP 2 ASSEMBLE MAIN FRAME 1. Slide Cable Height Adjuster Assembly (10) onto the Cable Adjusting Connector (4). Attach the Cable Adjusting Connector (4) to the base of Left Main Upright (2L), using one 3/8" X 3-1/4" Hex Bolt (47) two 3/8" Washers (61) and one 3/8" Nylon Nut (64) and to the top of the Left Main Upright (2L), using one 3/8"...
Page 9
STEP 3 ASSEMBLE GUIDE ROD AND WEIGHT PLATE 1. Insert two plastic Guide Rod Holders (66) into the base of Left Main Upright (2L). 2. Slide a Rubber Cushion (37) onto one end of each Guide Rods (3), then insert the Guide Rods (3) into the Plastic Guide Rod Holder (66) in the Left Main Upright (2L) as shown.
Page 10
STEP 4 ASSEMBLE CABLE AND PULLEY SIMULTANEOUSLY Make certain long Pin Bolt is inserted completely through both holes in the pulley bracket. Failure to do so will result in improper alignment and the pulley will rub on steel. Assemble cables and pulleys simultaneously. 1.
Page 11
STEP 4 ASSEMBLE CABLE AND PULLEY SIMULTANEOUSLY HI/LO CABLE (31) Steel Head End Ball End T6,T5...
Page 12
STEP 5 ASSEMBLE ACRYLIC PANELS 1. Attach acrylic panels as shown using six Plastic Studs (44) and six M6 x 40L Round Head Bolts (53) per panel. Makes sure that panels with slot and printed weight stack numbers are applied to the inside. Note: Do not over tighten! Over tightening will crack the panels!
Page 13
Guide Rods (3). 7. Enjoy many years of a Fit Lifestyle. Thank you for purchasing the BodyCraft PFT Cable Gym. If you have any questions, please call your local BodyCraft dealer, call our customer service department at 800-990-5556 or at...
Need help?
Do you have a question about the PFT and is the answer not in the manual?
Questions and answers