BodyCraft K2 Instruction Manual page 15

Gym strength training system
Hide thumbs Also See for K2:
Table of Contents

Advertisement

Ball end
1. Route the AB cable (58) through the slot and over the pulley mounted in Front Upright (5) as shown
in inset A1. Mount pulley using one 3/8" X 2-1/2" Hex Bolt (133), two 3/8" Washers (152) and one
3/8" Nut (159).
2. Continue cable routing down to the pulley mounted on Cable Arm Connector (16) as shown in inset
A2. Mount the pulley using one 3/8" X 1-3/4" Hex Bolt (134) and one 3/8" Nut (159).
3. Continue cable routing up and over the pulley mounted in lower half of the Floating Pulley Block (42)
as shown in inset A3. Mount the pulley in one of the bottom holes of the Floating Pulley Block (42)
using one 3/8" X 1-3/4" Hex Bolt (134) and one 3/8" Nut (159). The multiple holes are for cable
adjustment. When cabling is complete, this pulley can be moved upward to take up slack, or
downward to gain length.
4. Continue cable routing down to the pulley mounted on Base Frame (1) as shown in inset A4. Mount
the pulley using one 3/8" X 1-3/4" Hex Bolt (134) and one 3/8" Nut (159).
5. Continue cable forward, toward the front of the machine, under pulley A5. Mount the pulley using
one 3/8" X 1-3/4" Hex Bolt (134) and one 3/8" Nut (159).
6. End the routing of the AB cable (58) under the pulley on the Leg Extension Arm (13). Mount the
pulley using one 3/8" X 3" Hex Bolt (131), two 3/8" Washers (152), two 3/8" Bushings (108) and one
3/8" Nut (159) as shown in inset A6.
A1
5
133
92
152
152
159
A4
92
134
159
1
A5
92
134
159
A6
131
13
152
108
108
92
STEP 8
A2
92
134
16
159
1
152
159
AB Cable
AB CABLE (58)
A3
T3
42
134
159
92
A6
14
Ball with hook end
T3
A3
A1
A2
A4
A5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents