Cable Arm - BodyCraft GXP Assembly Instruction Manual

Gxp strength training system
Hide thumbs Also See for GXP:
Table of Contents

Advertisement

STEP 6 INSTALL AB CRUNCH CABLE
Removable End of AB Cunch Cable should be screwed into completely after the AB Crunch Ccable installment.
1. Run the threaded end of the AB Crunch Cable (67) underneath the slot of pulley A1 mounted on Leg
Extension Arm (19), under pulley A2 mounted at the bottom hole of Seat Frame (4), using one each
3/8" X 30.5L Flat Pin Bolt (122) and one M6 X 12L Male Screw (124).
2. Route cable under and around pulley A3 mounted at Cable Arm Assembly (17), using one each 3/8" X
65L Flat Pin Bolt (119) and one M6 X 12L Male Screw (124). Continue to run cable up and over pulley
A4 mounted at lower Pulley Block and down to around pulley A5, using one each 3/8" X 30.5L Flat Pin
Bolt (122) and one M6 X 12L Male Screw (124).
AB CRUNCH CABLE (67)
A6
A4
A5
A3
REMOVABLE END (67A)
3. Route the cable up to pulley A6, mounted at
the front of the Main Frame (1), using one
3/8" X 109.5L Flat Pin Bolt (118) and one M6
X 12L Male Screw (124). Now, screw the
Removable End (67A) into the threaded end of AB
Crunch Cable (67) completely as shown Fig. A6.
A1,A2
4
19
124
A2
76
106
137
5
145
137
A3
76
119
5
124
A2
A1
13
A4
122
21
124
76
A1
A5
76
124
18
67
124
1
T8
122
76
122
67A
118
76
A6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents