1.
Connect the power supply cable to the secondary side of the earth leakage breaker and
grounding.
2.
Plug the power supply cable in to the power cable connector on the product.
Power cable hole
3.3 Installation
3-10
Grounded socket
Power supply connector
Fig. 3-6 Wiring of power supply