WARNING: Varning! För att minska brandrisken skall endast Nr. 26 AWG eller
större telekommunikationsledning användas.
Installation Safety Guidelines and Warnings
Observe the following guidelines and warnings before and during Services Router
installation:
Chassis Lifting Guidelines
The weight of a fully populated chassis is approximately 12 lbs (5.4 kg)
for a J2300 Services Router, 21 lbs (9.5 kg) for a J4300 Services Router,
and 24 lb (10.9 kg) for a J6300 Services Router. Observe the following
guidelines for lifting and moving a Services Router:
Installation Instructions Warning
WARNING: Read the installation instructions before you connect the router to
a power source.
Waarschuwing Raadpleeg de installatie-aanwijzingen voordat u het systeem met
de voeding verbindt.
Varoitus Lue asennusohjeet ennen järjestelmän yhdistämistä virtalähteeseen.
Chassis Lifting Guidelines on page 237
Installation Instructions Warning on page 237
Rack-Mounting Requirements and Warnings on page 238
Ramp Warning on page 242
Before moving the Services Router, read the guidelines in "Preparing for Router
Installation" on page 85 to verify that the intended site meets the specified
power, environmental, and clearance requirements.
Before lifting or moving the Services Router, disconnect all external cables.
As when lifting any heavy object, lift most of the weight with your legs rather
than your back. Keep your knees bent and your back relatively straight and
avoid twisting your body as you lift. Balance the load evenly and be sure
that your footing is solid.
Safety and Regulatory Compliance Information
Safety Guidelines and Warnings
237