C.2.2  Installing The New Power Supply - Comtech EF Data HPOD Installation And Operation Manual

C-, x-, ku-band high-power outdoor amplifier
Hide thumbs Also See for HPOD:
Table of Contents

Advertisement

HPOD C-, X-, Ku-Band High-Power Outdoor Amplifier
Appendix C
C.2.2 Installing the New Power Supply
To re‐install the power supply: 
 
Step
Task
1
Visually inspect the exposed SSPA heat sink for any debris/ blockage. Use compressed air to
clear/clean if needed.
2
Visually inspect both the SSPA and power supply connector for damage/cleanliness. Correct
and/or clean as required.
3
Inspect the gasket for damage. Replace as required
4
Place supply on SSPA, ensuring the guide pins and connection are properly aligned. Gently
press to engage the connector.
5
Tighten the four captive fasteners where indicated previously in Figure C-1.
 
Be sure to use an appropriate screwdriver, such as the one provided with the
SSPA, to avoid damaging the fasteners.
C–3
Revision 6
MN/HPOD.IOM

Advertisement

Table of Contents
loading

Table of Contents