Chapter 2 Installing the Tape Library
2.5 Rack Mounting the Tape Library
Procedure
1
If you use a Fujitsu Technology Solutions PRIMECENTER rack you first have to mount the
support bracket in the appropriate height to the - seen from the front of the rack - left rear
rack post as shown below.
Figure 2.5 Mounted support bracket
2
Mount a cage nut at the appropriate height to the right and left rack post each. Mount them
in the middle square hole of the height unit in which you mounted the support bracket.
(The middle of a height unit is the hole between two wide and neighboring division bars.)
Figure 2.6 Mounting cage nuts at the front of the rack (PRIMECENTER rack)
FUJITSU Storage ETERNUS LT20 S2 LTO Library Installing, Starting Up and Maintaining
Height unit no. 26
Copyright 2014 FUJITSU LIMITED
24
P3AM-5382-03ENZ0