Chapter 2 Installing the Tape Library
2.5 Rack Mounting the Tape Library
5
Screw on the upper lug of the front rail end to the right front rack post using one screw with
centering washer as shown below.

Figure 2.8 Screwing on the right rail at the front

6
Then fasten the rail on the rear side with two screws with centering washers as shown
below.

Figure 2.9 Mounted right sliding rail (rear side)

FUJITSU Storage ETERNUS LT20 S2 LTO Library Installing, Starting Up and Maintaining
26
Copyright 2014 FUJITSU LIMITED
P3AM-5382-03ENZ0