Figure 2.7 Mounted Support Bracket; Figure 2.8 Mounting Cage Nuts At The Front Of The Rack (Primecenter Rackmount Rail) - Fujitsu ETERNUS LT40 S2 Installing, Starting Up And Maintaining

Hide thumbs Also See for ETERNUS LT40 S2:
Table of Contents

Advertisement

Chapter 2 Installing the Tape Library
2.5 Rack Mounting the Library
Installing the Library
Procedure
1
If you use a Fujitsu Technology Solutions PRIMECENTER rack you first have to mount the
support bracket in the appropriate height to the - seen from the front of the rack - left rear
rack post as shown below.

Figure 2.7 Mounted support bracket

2
Mount a cage nut at the appropriate height to the right and left rack post each. Mount them
in the middle square hole of the height unit in which you mounted the support bracket.
(The middle of a height unit is the hole between two wide and neighboring division bars.)

Figure 2.8 Mounting cage nuts at the front of the rack (PRIMECENTER rackmount rail)

3
Place the right rail (support angle down) from the front into the rack, putting the
positioning tappet into the appropriate hole of the right rear rack post.
FUJITSU Storage ETERNUS LT40 S2/LT60 S2 LTO Library Installing, Starting Up and Maintaining
g
g
28
Copyright 2018 FUJITSU LIMITED
P3AM-5392-07ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus lt60 s2

Table of Contents