Chapter 2 Installing the Tape Library
2.5 Rack Mounting the Tape Library
3
Place the right rail (support angle down) from the front into the rack, putting the
positioning tappet into the appropriate hole of the right rear rack post.
4
Compress the spring mounted rail to its length, putting the preloaded screw head in the
lower front lug of the rail from behind into the appropriate hole of the right front rack post
as shown below.
The rail now is positioned between the two rack posts by its spring pressure. Support the rail
with one hand.
Figure 2.7 Setting in the right rail at the front