Reading The System Status Screen; Reading The Xw Inverter/Charger Home Screen - Xantrex XW4024-120 Operation Manual

Xw series hybrid inverter/charger
Table of Contents

Advertisement

Reading the System Status Screen

Reading the XW Inverter/Charger Home Screen

975-0240-01-01
Select Device menu
Select Device
XW6048
Select device from list
and press Enter to view
Device Setup menu
Figure 2-4 Selecting a Device Setup Menu
The System Status screen displays:
Qualified AC source (if applicable) and total power to and from the source
Battery voltage and capacity level
Net battery input or output current
Total inverter loading.
System Status
20.4A
115V
menu
"Menu" arrow indicates the Enter
button. Pressing Enter displays
the Select Device menu.
Figure 2-5 System Status Screen
The XW Inverter/Charger Home screen displays real-time operational data
specific to the XW Inverter/Charger. The XW Inverter/Charger status changes
according to the states described in Table 2-1 on page 2–12.
To view the XW Inverter/Charger Home screen:
u On the System Home screen, press the down arrow button until the XW
Inverter/Charger Home screen appears.
Monitoring Operation with the XW System Control Panel
XW Inverter/Charger
Setup menu
XW6048 00: Setup
Meters
53.9V
Line 1: Battery voltage and input/output current
E--F
Line 2: Battery level meter
1235W
Line 3: Power supplied to loads
3202W
Line 4: AC input source and line-to-neutral
voltage (averaged between L1 and L2). Bottom
left corner displays "AC1" or "AC2" depending on
the active input source. When selling to the grid,
the power displayed is negative.
[Enabled]
[Disabled]
[Disabled]
[Enabled]
[Bulk]
[Disabled]
[Operating]
2–11

Advertisement

Table of Contents
loading

Table of Contents