Installing And Powering On The Server Blade; Installing The Server Blade Into The C-Class Enclosure - HP Integrity BL860c User's & Service Manual

Server blade
Hide thumbs Also See for Integrity BL860c:
Table of Contents

Advertisement

Figure 20 Replacing the Access Panel
4.
Lock the access panel cam (if necessary) by turning the cam clockwise with the Torx T–15 or
flathead screwdriver.

Installing and Powering On the Server Blade

This section describes how to install the server blade into a standard c-Class enclosure and power
it on. When you install the server blade into the enclosure, the server blade powers up to standby
mode.

Installing the Server Blade into the c-Class Enclosure

To install the server blade into a standard c-Class enclosure:
1.
Remove the two half-height filler panels from the enclosure (if necessary).
2.
Remove the half-height blade shelf (if necessary).
3.
Ensure the extraction lever is released (open) on the server blade.
4.
Slide the server blade into the enclosure.
See
Figure
38
Installing the Server Blade Into the Enclosure
21.

Advertisement

Table of Contents
loading

Table of Contents