HP Integrity BL860c User's & Service Manual page 34

Server blade
Hide thumbs Also See for Integrity BL860c:
Table of Contents

Advertisement

Figure 16 Mezzanine Port Locations on the System Board
Mezzanine port 1: PCIe x4 port
1
Mezzanine port 2: PCIe x8 port
2
Mezzanine port 3: PCIe x8 port
3
The install order for the mezzanine cards is:
1.
PCIe x4 card – Install into mezzanine port 1
2.
PCIe x8 card – Install into mezzanine port 2
3.
PCIe x8 card – Install into mezzanine port 3
If you are only loading PCIe x8 cards, install them into port 2, then port 3.
Mezzanine port 1 is lower than mezzanine ports 2 and 3 to allow the cards to be stacked on top
of each other.
34
Installing the Server Blade Into the Enclosure
Figure 17
shows the mezzanine port heights.

Advertisement

Table of Contents
loading

Table of Contents