Connecting Loads; Load Wiring; Figure 5-22 Agilent E6176A Connectors J1/J2 And Mating Connectors P1/P2 - Agilent Technologies E6198B User Manual

Functional test system switch/load unit
Table of Contents

Advertisement

5
Using Load Cards and Loads

Connecting Loads

Figure 5-22 Agilent E6176A Connectors J1/J2 and Mating Connectors P1/P2

Mating
Connector
for J1
Mating
Connector
for J2

Load Wiring

C A U T I O N
5-32
Loads are mounted externally and connected to the load card
via wires or cables. The loads are wired to connectors P1 and P2
which mate to the Agilent E6176A's J1 and J2 connectors,
respectively.
Figure 5-13
J1
J2
Figure 5-23
is a simplified schematic and connector pinouts
showing how loads are connected to P1/P2. Loads 1 through 8
connect to P1 and loads 9 through 16 connect to P2.
To prevent premature pin failure from excessive current flow,
when connecting high-current (>3 amp) loads to P1, wire
across all three pins in each row (see Figure 5-24 on page
34).
shows these connectors.
E6198B Switch/Load Unit User Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ts-5000

Table of Contents