POST Test Failure and Recovery Actions
Error Messages
This section provides information on what actions to perform if the switch
fails any of the POST tests.
If you run the portStatsShow or the diagShow command prior to
Note
running an individual test, errors may appear as a result of the normal
synchronization process. These errors should be addressed if the number of
errors found increases after running the portStatsShow command again.
Table 16. Post Test Recovery Action
Failed test
*
ramTest
portRegTest
*
centralMemoryTest
cmiTest
*
cmemRetentionTest
sramRetentionTest
camTest
*
portLoopbackTest
crossPortTest
spinSilk
* These tests are run during the POST (power on self test).
Recovery Action
replace DRAM module or mainboard assembly
replace mainboard assembly
replace mainboard assembly
*
replace mainboard assembly
replace mainboard assembly
replace mainboard assembly
replace mainboard assembly
replace mainboard assembly
*
replace mainboard assembly, GBIC, or fibre
cable
replace mainboard assembly, GBIC, or fibre
cable
253