Start-Up/Shutdown/ Recycle Sequence; Local Start-Up - Carrier 19XRV Start-Up, Operation And Maintenance Instructions Manual

Hermetic centrifugal liquid chillers with pic iii controls 50/60 hz hfc-134a
Table of Contents

Advertisement

START-UP/SHUTDOWN/
RECYCLE
SEQUENCE
(Fig. 27)
Local
Start-Up
--
L_cal start-up (ora manual start-up) is
initiated by pressing the _
menu softkey on the default
ICVC
scleen.
Ix_c_d start-up
can proceed
when
the chiller
schedule indicates that the CURRENT
TIME and CURRENT
DATE have been established
as a mn time and date, and after
the
internal
timers
have
expired.
The
timers
include
a
15-minute start-to-start
timer and a l-minute
stop-to-start
tim-
el. which together serve to prevent excessive cycling and abuse
of the motol: The value of these timers is displayed as START
INHIBIT
TIMER and can be viewed on the MAINSTAT
and
DEFAULT
screens. Both timel_ must expire before the chiller
will stall. If the timers have not expired,
the RUN STATUS
pm'ameter on the MAINSTAT
screen will read TIMEOUT.
NOTE:
The time schedule
is said to be "occupied"
if the
OCCUPIED
? pmameter
on the MAINSTAT
scleen is set to
YES. For more information
on occupancy
schedules,
see the
sections on Time Schedule
Operation
(page 21), Occupancy
Schedule
(page
36), and
To Prevent
Accidental
Stall-Up
(page 67), and Fig. 19.
If the OCCUPIED
? pm'ameter on the MAINSTAT
screen
is set to NO, the chiller can be forced to stm't as follows. From
the default [CVC screen, press the _
and
softkeys. Scroll to highlight MAINSTAT.
Pless the
softkey. Scroll to highlight
CHILLER
START/STOP.
Press the
softkey to override the schedule and start the chiflel:
NOTE: The chiller will continue to run until this forced start is
released,
regardless
of the progrmnmed
schedule.
To release
the forced start, highlight
CHILLER
START/STOP
fiom the
MAINSTAT
screen and press the [RELEASE]
softkey. This
action returns the chiller to the stmt and stop times established
by the schedule.
The chiller may also be stmted by overriding the time sched-
ule.
From
the
default
screen,
press
the
_
and
[SCHEDULE]
softkeys.
Scroll down and select the current
schedule. Select OVERRIDE,
and set the desiled override time.
Another condition
for st;ut-up must be met for chillers that
have the REMOTE
CONTACTS
OPTION
on the EQUIP-
MENT SERVICE
screen set to ENABLE.
For these chillers,
the REMOTE
START CONTACT
parameter
on the MAIN-
STAT screen
must
be CLOSED.
From
the ICVC
default
screen, press the _
and _
softkeys. Scroll to
highlight MAINSTAT
and press the _
softkey. Scroll
down the MAINSTAT
screen to highlight
REMOTE
START
CONTACT
and press the _
softkey. Then, press the
softkey.
To end
the override,
select
REMOTE
CONTACTS
INPUT and press the [RELEASE ] softkey.
Once local start-up begins, the PIC III performs a series of
pre-start tests to verify that all pre-start alefls and safeties are
within the limits shown in Table 7. The RUN STATUS parame-
ter on the MAINSTAT
screen line now reads PRESTART.
If a
test is not successful,
the start-up is delayed or aborted. If the
tests are successful,
the CHILLED
WATER PUMP relay ener-
gizes, and the RUN STATUS line now reads STARTUR
See
Table 9.
Five seconds latel', the CONDENSER
WATER PUMP relay
energizes.
Thirty seconds later the PIC III monitors
the chilled
water trod condenser
water flow devices
and waits until the
WATER FLOW
VERIFY TIME (operator-configured,
default
5 minutes)
expires to confirm
flow. After flow is verified, the
chilled water temperature
is compmed
to CONTROL
POINT
plus/_
CHILLED
WATER DEADBAND.
If the temperature
is
less than
or equal
to this
value,
the PIC
III turns
off
the CONDENSER
WATER
PUMP
relay
and goes into a
RECYCLE
mode.
NOTE:
19XRV units are not available
with factou-installed
chilled water or condenser
water flow devices (available
as an
accesso U for use with the CCM Control board).
If the water/brine
temperature
is high enough,
the st;u't-up
sequence
continues and checks the guide vane position. If the
guide vanes are more than 4% open, the stall-up
is delayed
until the PIC IIl closes the vanes. If the vanes are closed and
the oil pump pressure is less than 4 psi (28 kPa), the oil pump
relay energizes.
The PIC [II then waits until the oil pressure
(OIL PRESS
VERIFY
TIME, operator-configured,
default
of
40 seconds) leaches a maximum
of 18 psi (124 kPa). After oil
pressure is verified, the PIC III waits 40 seconds, and the VFD
energizes to start the compressol:
Compressor
ontime and service ontime timers start, and the
complessor
STARTS IN 12 HOURS counter and the number of
stalls over a 12-hour period counter advance by one.
Ftfilure to verily any of the requirements
up to this point will
result in the PIC III aborting the stall and displaying
the appli-
cable pre-start mode of failure on the ICVC default screen. A
pre-start failure does not advance
the STARTS IN 12 HOURS
countel: Any failure after the VFD has energized
results in a
safety shutdown,
advances
the starts in 12 hours counter by
one, and displays the applicable
shutdown
status on the [CVC
display.
The minimum
time to complete
the entire
prestart
sequence is approximately
185 seconds.
Table 9 -- Prestart
Checks
QUANTITY CHECKED
STARTS IN 12 HOURS
COMP THRUST BRG TEMP
COMP MOTOR WINDING TEMP
COMP DISCHARGE
TEMP
EVAPORATOR
REFRIG TEMP
OIL SUMP TEMP
CONDENSER
PRESSURE
PERCENT
LINE VOLTAGE
PERCENT
LINE VOLTAGE
ACTUAL GUIDE VANE POS
REQUIREMENT
< 8 (not counting recycle restarts or auto restarts after power failure)
ALERT is cleared once RESET is pressed.
< [COMP THRUST BRG ALERT] -10 ° F (5.6 ° C)
< [COMP MOTOR TEMP OVERRIDE]
-10 ° F (5.6 ° C)
< [COMP DISCHARGE
ALERT] -10 ° F (5.6 ° C)
< [EVAP REFRIG TRIPPOINT]
+ [REFRIG OVERRIDE
DELTA T]
< 150 ° F (65.5 ° C) or <[EVAP REFRIG TEMP] + 50 ° F (10 ° C)
< CONDENSER
PRESSURE
OVERRIDE -20 PSI (138 kPa) and
< 145 psi (1000 kPa)
< [UNDERVOLTAGE
THRESHOLD]
> [OVERVOLTAGE THRESHOLD]
Must have been calibrated
ALERT STATE
100
101
102
103
104
105
106
107
108
109
IF FALSE
5O

Advertisement

Table of Contents
loading