Carrier 19XRV Start-Up, Operation And Maintenance Instructions Manual page 137

Hermetic centrifugal liquid chillers with pic iii controls 50/60 hz hfc-134a
Table of Contents

Advertisement

INITIAL
START-UP
CHECKLIST
FOR 19XRV HERMETIC
CENTRIFUGAL
LIQUID
CHILLER
(Remove
and use for job file.)
MACHINE INFORMATION:
NAME
ADDRESS
CITY
STATE
JOB NO.
MODEL
ZIP
S/N
DESIGN CONDITIONS:
TONS
BRINE
(kW)
COOLER
CONDENSER
FLOW
TEMPERATURE
RATE
IN
TEMPERATURE
PRESSURE
PASS
SUCTION
OUT
DROP
TEMPERATURE
CONDENSER
TEMPERATURE
COMPRESSOR:
Volts
STARTER:
Mfg
OIL PUMP:
Volts
RLA
OLTA
Type
S/N
RLA
OLTA
REFRIGERANT:
Type: __
CARRIER OBLIGATIONS:
Charge __
Assemble ...................
Yes []
No []
Leak Test ...................
Yes []
No []
Dehydrate ..................
Yes []
No []
Charging ...................
Yes []
No []
Operating Instructions
Hrs.
START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP INSTRUCTIONS
JOB DATA REQUIRED:
1. Machine Installation Instructions
..................
Yes []
No []
2. Machine Assembly, Wiring and Piping Diagrams ......
Yes []
No []
3. Starting Equipment Details and Wiring Diagrams ......
Yes []
No []
4. Applicable Design Data (see above) ................
Yes []
No []
5. Diagrams and Instructions for Special Controls .......
Yes []
No []
INITIAL MACHINE PRESSURE:
YES
NO
Was Machine Tight?
If Not, Were Leaks Corrected?
Was Machine Dehydrated After Repairs?
CHECK OIL LEVEL AND RECORD:
RECORD PRESSURE DROPS:
Cooler
CHARGE REFRIGERANT:
Initial Charge
3/4
1/2 Top sight glass
1/4
3/4
1/2 Bottom sight glass
1/4
ADD OIL:
Yes []
Amount:
No []
Condenser
Final Charge After Trim
Manufacturer
reserves the right to discontinue, or change at any time_ specifications
or designs without notice and without incurring obligations.
Book
2
h
PC 211
Catalog No, 531-986
Printed in U.S,A.
Form 19XRV-1SS
CL-1
4-05
Replaces:
New
F
Tab

Advertisement

Table of Contents
loading

Table of Contents