Carrier 19XRV Start-Up, Operation And Maintenance Instructions Manual page 72

Hermetic centrifugal liquid chillers with pic iii controls 50/60 hz hfc-134a
Table of Contents

Advertisement

FRAME
ASSEMBLY
CONTROL
PANEL
VALVE
2_
VALVE
4_
VALVE /
5
ENTERING
WATER
_COMPRESSOR
/
OIL
SEPARATOR
LEAVING
CONDENSER
WATER
Fig. 40 -- Pumpout Unit
Transfer
Refrigerant
fiOl]l Pumpout
Storage
Tank to Chiller
c.
Turn off tile pumpout
compressor.
d.
Turn off the chiller water pumps.
e.
Close valves 3 and 4.
f.
Open valves 2 and 5.
VALVE
la
lb
2
3
4
5
6
7
10
11
CONDITION
C
C
C
C
g.
Turn on pumpout
condenser
watec
h.
Run the pumpout
compressor
in manual
mode until
the storage tank pressure
reaches
5 psig (34 kPa),
18 in. Hg vacuum
(41 kPa absolute).
i.
Turn off the pumpout
compressor.
j.
Close valves
I a, I b, 2, 5, and 6.
VALVE
la
lb
2
3
4
5
6
7
10
11
CONDITION
C
C
C
C
C
C
C
C
C
k.
Turn off pumpout
condenser
watel:
Transfer
the Refrigerant
from Chiller
to Pumpout
Storage
Tank
1. Equalize refrigerant
pressure.
a.
Valve positions:
During transfer
of refrigerant
into and out of the 19XR
storage tank, carelhlly
monitor the storage tank level gage.
Do not fill the tank more than 90% of capacity to allow for
refrigerant
expansion.
Overfilling
may result in &image to
the tank and personal injury.
Equ_dize refligerant
pressure.
a.
Turn on chiller
water pumps
and monitor
chiller
pressures.
b.
Close pumpout
and storage
tank valves
2, 4, 5, and
10, and close
refrigerant
charging
valve
7; open
chiller
isolation
valve
11 and
any other
chiller
isolation
valves, if present.
c.
Open
pumpout
and storage
tank valves
3 and 6;
open chiller valves
la and lb.
VALVE
la
lb
2
3
4
5
6
7
10
11
CONDITION
C
C
C
C
C
d.
Gradually
crack
open
valve
5 to increase
chiller
pressure to 35 psig (241 kPa). Slowly feed refriger-
ant to prevent freeze-up.
e.
Open valve 5 fully after the chiller
pressure
rises
above the freezing
point of the refrigerant.
Let the
storage
tank and chiller
pressure
equalize.
Open
refrigerant
charging
valve
7 and
storage
tank
charging
valve 10 to let liquid refrigerant
drain into
the chiller.
VALVE
]la
lb
2
3
4
5
6
7
10
11
CONDITION
2.
Transfer
remaining
refrigerant.
VALVE
11
CONDITION
a.
Close
valve
5 and
open
valve
4. Turn
off the
pumpout
condenser
water,
and
turn
on
the
pumpout
compressor
in manual
mode
to push
liquid refrigerant
out of the storage
tank. Monitor
the storage tank level until the tank is empty.
b.
Close refrigerant
charging
valves 7 and 10.
VALVE
la
lb
2
3
4
5
6
7
10
11
CONDITION
C
C
C
C
C
b.
Slowly
open
wflve
5 and
refrigerant
charging
valves 7 and 10 to allow liquid refrigerant
to drain
by gravity into the storage tank.
VALVE
11
CONDITION
2. Transfer the remaining
liquid.
a.
Turn off pumpout
condenser
water. Place valves in
the following
positions:
VALVE
11
CONDITION
b.
Run the pumpout
compressor
in automatic
mode
until vacuum
switch
is satisfied
and compressor
stops. Close valves 7 and 10.
VALVE
la
lb
2
3
4
5
6
7
10
11
CONDITION
C
C
C
C
c.
Turn off the pumpout
compressor.
3. Remove any remaining
refrigerant.
a.
Turn on chiller water pumps.
b.
Turn on pumpout
condenser
watec
c.
Place valves in the following
positions:
Run the pumpout
compressor
until the chiller pres-
sure reaches
35 psig (241 kPa); then, shut off the
pumpout
compressor.
Warm
chiller
condenser
water will boil off any entrapped
liquid refrigerant
and chiller pressure
will rise.
When
chiller
pressure
rises to 40 psig (276 kPa),
turn on the pumpout
compressor
until the pressure
again reaches
35 psig (241 kPa), then, turn off the
pumpout
compressor.
Repeat
this process until the
chiller
pressure
no longer
rises; then, turn on the
pumpout
compressor
and pump out until the chiller
pressure
reaches
18 in. Hg vacuum
(41 kPa abso-
lute). This can be done in On or Automatic
mode.
72