Preparing The New Carry Handle - Barco CLM R10+ R90501001 User Manual

Hide thumbs Also See for CLM R10+ R90501001:
Table of Contents

Advertisement

F. Mounting optional Carry handle
B
B
A
A
Image F-2
Mounting the stacking points
Image F-3
Stacking points mounted
F.2

Preparing the new carry handle

What has to be done?
The back stacking point must be removed before the carry handle can be mounted on the CLM projector. The fixation hole for the
fixation bolt of the carry handle is covered by the stacking point construction.
How to remove the stacking point construction
1. Turn out the 4 bolts, 2 on each side. Be aware that there is a nut for each bolt on the inside of the carry handle. (image F-4)
210
C
A
R59770021 CLM R10+ 11/10/2010

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clm r10+ r90501005Clm r10+ r9050100Clm r10+

Table of Contents