EPSON Stylus Photo R260/R265/R270, R360/R380/R390
Lubrication is required. See the page given below for the
lubrication information.
"6.1.3 Lubrication (p.131)"
When installing the CR Motor, install it so that the print side
faces upwards.
Figure 4-125. Reinstalling the CR Motor
Tighten the screws in the order given in Fig.4-124.
When installing the Timing Belt, make sure that it is not
twisted and the lumpy side faces inward.
Routing of the CR Motor/PE Sensor cables
Route the cables as described below referring to the Fig.4-123.
1. Wrap the CR Motor Cable together with the PE Sensor Cable
with the 20mm-length acetate tape at the (1) position.
2. Align the center of the taped portion with the center of the
hook (1), then wrap the cables at another two positions each
with 20 mm-length acetate tape so that the center of the each
taped portion comes to the center of hook (2) and (3)
respectively.
3. Secure the taped cables with the (1) (2) (3) hooks so that the PE
Sensor Cable faces inward.
Route the PE Sensor Cable on the left side of the printer
referring to the page below.
"Routing of the APG and PE Sensor Cables." (p.102)
Route the PF Motor cables on the left side of the printer
referring to the page below.
"Routing of the PF Motor cables" (p.103)
Whenever the CR Motor is replaced, the required adjustments
must be carried out.
See "Table 5-4. Adjustment Items (p.116)" in Chapter 5
Disassembly/Assembly

4.5.9 EJ Frame Assy

Parts/Components need to be removed in advance
All exterior parts/ All control boards / Middle Housing / Printer Mechanism / CR Scale
/ APG Unit
Removal procedure
1.
Move the CR Unit to the HP side.
2.
Peel off the acetate tape, and disengage the Head FFC from the hook, peel off
the two double-sided tapes and remove the Head FFC from the Front Frame.
[Rear side]
Disassembly of the Printer Mechanism
Take extra care to avoid injury from sharp metal edges. Before
starting, see the page given below to check the dangerous edges.
"4.1.8 Sharp Metal Edges (Danger!)" (p.62)
Refer to the Orientation Definition below for the directions
indicated in the following procedures.
"4.1.6 Orientation Definition (p.61)"
CR Unit
Figure 4-126. Moving the CR Unit
Head FFC
Double-sided tape
Figure 4-127. Removing the Head FFC
Revision B
Hook
Acetate Tape Position
100