Related
Documentation
Copyright © 2010, Juniper Networks, Inc.
Table 23: show issu Output Fields (continued)
Field Name
CLI sessions ready?
Routing applications ready?
Protocol Timers ready?
ISSU Criterion Detail
Problem
Reporting Slot
Impact
Remedy
show issu
Chapter 5: Configuring a Unified In-Service Software Upgrade
Field Description
Criteria required for unified ISSU activation. Possible
values: Yes, No, Conditional.
NOTE: All criteria must be "yes" for unified ISSU to
be active.
Criteria required for unified ISSU activation. Possible
values: Yes, No, Conditional.
NOTE: All criteria must be "yes" for unified ISSU to
be active.
Criteria required for unified ISSU activation. Possible
values: Yes, No, Conditional.
NOTE: All criteria must be "yes" for unified ISSU to
be active.
Detailed information on why the criteria required for
unified ISSU activation was not met or was
conditional.
The reason why the criteria for unified ISSU activation
is not met.
Slot where the issue occurred.
What happens if you continue with the upgrade.
What you can do to fix the Problem.
147
Need help?
Do you have a question about the JUNOSE SOFTWARE FOR E SERIES 11.3.X - SERVICE AVAILABILITY CONFIGURATION GUIDE 2010-10-08 and is the answer not in the manual?
Questions and answers