JunosE 11.3.x Service Availability Configuration Guide
and then cold started when ISSU Upgrade completes
Remedy: If not standby, Wait for card to come online before
proceeding
4
Configuration conversion support ready?
5
CLI sessions ready?
6
Routing applications ready?
7
Protocol timers ready?
Meaning
146
Table 23 on page 146 lists the show issu command output fields.
Table 23: show issu Output Fields
Field Name
ISSU state
ISSU description
criteria met
running release
armed release
ISSU Activation Criteria Summary
In-Service Software Upgrade
ready?
High-Availability ready?
Line Modules ready?
Configuration conversion support
ready?
Yes
Yes
Yes
Yes
Field Description
State of the upgrade process, idle, initializing,
initialized, or upgrading
State of the upgrade, including percent complete
Whether prerequisites for the upgrade have been met
and, generally, what errors occurred
Filename of JunosE Software release that is currently
running on the SRP modules
Filename of JunosE Software release that is armed
to become the next running release when the router
reboots
Summarizes the criteria for unified ISSU activation.
Criteria required for unified ISSU activation. Possible
values: Yes, No, Conditional.
NOTE: All criteria must be "yes" for unified ISSU to
be active.
Criteria required for unified ISSU activation. Possible
values: Yes, No, Conditional.
NOTE: All criteria must be "yes" for unified ISSU to
be active.
Criteria required for unified ISSU activation. Possible
values: Yes, No, Conditional.
NOTE: All criteria must be "yes" for unified ISSU to
be active.
Criteria required for unified ISSU activation. Possible
values: Yes, No, Conditional.
NOTE: All criteria must be "yes" for unified ISSU to
be active.
Copyright © 2010, Juniper Networks, Inc.
Need help?
Do you have a question about the JUNOSE SOFTWARE FOR E SERIES 11.3.X - SERVICE AVAILABILITY CONFIGURATION GUIDE 2010-10-08 and is the answer not in the manual?
Questions and answers