Saving Repackager Projects - Novell ADMINSTUDIO 9.5 User Manual

Hide thumbs Also See for ADMINSTUDIO 9.5:
Table of Contents

Advertisement

Task:
To create a report detailing captured data:
1.
From the Project menu, select Create Report. The Create Report dialog box opens.
2.
Select whether you want the report to contain All captured data (all of the data collected during the entire
capture), or just the Current view.
3.
If you want the report to contain data from the entire capture, specify whether you want to just display
summary information.
4.
Specify whether you want to display excluded items in the report.
5.
Select the file format for the report. You can generate an HTML report or a Text report.
6.
Click Create. A Save As dialog box opens.
7.
From the resulting Save As dialog box, browse to the location where you want to save the file, and provide a
name for the report.
8.
Click Save. The report is saved to the specified location and automatically opens.

Saving Repackager Projects

Edition •
To save a Repackager project, perform the following steps:
Task:
To save the current Repackager project:
1.
Select Save from the File menu.
or
2.
Click the Save button ( ) on the toolbar.
AdminStudio 9.5 User Guide
Chapter 8: Converting Legacy Installations Using the Repackager Interface
ADS-0950-UG00
Working With Repackager Projects
545

Advertisement

Table of Contents
loading

Table of Contents