4
A
Minimum distances
When installing the Charge Point, respect the minimum distances for maintenance
and safety reasons.
•
Do not install near areas where water or fluids can penetrate into the unit.
•
Do not install the Charge Point on unstable terrain.
(*) Respect the minimum lateral distance to allow proper circulation of air flow. This
unit has forced ventilation.
(**) If Bollard Impact Protector is installed, keep 600 mm as a minimum distance
in order to give enough space to open the frontal door of the Charge Point for
maintenance tasks.
Note: In the event of any doubt about the installation of the Charge Point, it will
be necessary to define a final solution to install the unit. It must be confirmed by a
specific technical project made for an architectural firm prior to its installation.
Installation
07
Need help?
Do you have a question about the Raption Series and is the answer not in the manual?
Questions and answers