Installation; A Minimum Distances - Circontrol Raption Series Quick Start Installation Manual

Hide thumbs Also See for Raption Series:
Table of Contents

Advertisement

4
A
Minimum distances
When installing the Charge Point, respect the minimum distances for maintenance
and safety reasons.
Do not install near areas where water or fluids can penetrate into the unit.
Do not install the Charge Point on unstable terrain.
(*) Respect the minimum lateral distance to allow proper circulation of air flow. This
unit has forced ventilation.
(**) If Bollard Impact Protector is installed, keep 600 mm as a minimum distance
in order to give enough space to open the frontal door of the Charge Point for
maintenance tasks.
Note: In the event of any doubt about the installation of the Charge Point, it will
be necessary to define a final solution to install the unit. It must be confirmed by a
specific technical project made for an architectural firm prior to its installation.

Installation

07

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Raption Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Raption 50Raption 51Raption 52Raption 100

Table of Contents