Raption Series Quick Start Installation Manual
Placing
C
In order to place the Charge Point in its final location, please follow the next steps:
1 — R E M O V I N G T H E C H A R G E P O I N T F R O M PA L L E T
The Charge Point is mounted on a pallet so as to do a safe transport. It has to be
removed before to installation.
Steps:
1- Remove the screws from the Decorative front panel (on both sides) and pull
it outwards.
2- Once the Decorative front panel is removed, locate the screws that are
fixing the pallet. Remove the screws with a 17 mm spanner tool.
2 — P L AC I N G T H E C H A R G E P O I N T T O T H E F I N A L L O C AT I O N
Once the Charge Point is free from the pallet, there are two options to move it to the
final location.
a) Move the Charge Point with eyebolts
Steps:
1- Take off the 10 x M6 nuts that are keeping the cover, lift a little the cover and
disconnect the 3G antenna connector, courtesy light connector and the exhaust
fan connector.
2- Remove totally the cover from the top of the Charge Point.
3- Locate and make sure that the eyebolts provided are strongly tight.
4- Hold the sling to the eyebolts, raise the Charge Point up and placed on the
final location.
5- Screw the 4 x M16 nuts with washers on the threaded rods already installed
on the base (on both sides), place again the unit cover, connect the 3G antenna
connector, courtesy light connector and the exhaust fan connector and assembly
the decorative front panel.
Note: do not remove the eyebolts from the Charge Point, leave it under the cover.
10
Need help?
Do you have a question about the Raption Series and is the answer not in the manual?
Questions and answers