Raption Series Quick Start Installation Manual
1
This manual provides information for installing the Charge Point, which has been
designed and tested to allow charging electric vehicles.
It is mandatory to follow the basic security information supplied in this manual to ensure
safe and proper installation. Failure to follow safety instructions may involve personal
injury, equipment damage and danger of death. CIRCONTROL is not responsible for
events arising from such breach.
•
Compliant with IEC 61851 (IEC 61851-1, IEC 61851-21-2, IEC 61851-23 and IEC
61851-24) and IEC 62196 (IEC 62196-1, IEC 62196-2 and IEC 62196-3).
•
Compliant with CHAdeMO certification
•
Meets the CCS specification, DIN 70121. ISO 15118 ready
•
Directives: 2014/53/EU, 2014/30/EU, 2014/35/EU
•
RFID complies with ISO 14443A/B
•
Modem 4G complies with CE/RED
•
Compliant with RoHS 2011/65/EU-2017/2102
•
Permanently connected: EV supply equipment connected to AC supply network
•
Power supply output: AC and DC EV supply equipment
•
Equipment for locations with restricted access and non-restricted access
•
Stationary equipment: Ground mounted; floor mounted
•
Class I protection against electric shock
•
Mode 3 and Mode 4 charging modes
Applies only to Raption 51, Raption 52 and Raption 100:
•
Meter complies with 2014/32/EU, Measuring Instruments Directive
02
So, hello!
Need help?
Do you have a question about the Raption Series and is the answer not in the manual?
Questions and answers