4.13 COMMISSIONING

Once the machine has been installed as per the previous paragraphs, proceed with commissioning as follows:
1. Check the wiring;
2. Power up and proceed with the first start-up by turning on the appliance according to the instructions on the control
terminal (see chapter 6);
3. Check the correct functioning of the fans and the by-pass (see chapter 6). The fans will stop for more than 10
seconds when the by-pass valve is operated;
4. IMPORTANT: check that the maximum speed of the fans corresponds to the nominal air flow of the
recuperator. To this end, check parameter 16 from the list in paragraph 6.4 SETTING PARAMETERS of this manual.
If the preset value is different from the expected one, adjust it according to the model type.
range of
value
0-1
0-1
0-1
0
0
0
0
0
0
0
0-23
0-59
1-7
1-99
function description
Bypass switch, 1=on 0=off
P-heating state 1=on 0=off
R-Heating state 1=on 0=off
0
0
0
0
0
0
0
System time: hour
System time: minute
System time: Week
IP address
remarks
61

Advertisement

Chapters

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HI-TECH PUR 4.0 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Acd300002Acd300003Acd300004Acd300005Acd300006

Table of Contents