Goodwe GW3600S-BP User Manual

Goodwe GW3600S-BP User Manual

Sbp series. ac-coupled battery storage retrofit
Hide thumbs Also See for GW3600S-BP:

Advertisement

Official Website
APP (iOS)
APP (Android)
Jiangsu GoodWe Power Supply Technology Co.,Ltd
SBP SERIES USER MANUAL
No.189 Kun Lun Shan Road, SND, Jiangsu, China.
www.goodwe.com
AC-COUPLED BATTERY STORAGE RETROFIT
service@goodwe.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GW3600S-BP and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Goodwe GW3600S-BP

  • Page 1 Official Website APP (iOS) APP (Android) Jiangsu GoodWe Power Supply Technology Co.,Ltd SBP SERIES USER MANUAL No.189 Kun Lun Shan Road, SND, Jiangsu, China. www.goodwe.com AC-COUPLED BATTERY STORAGE RETROFIT service@goodwe.com...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS TABLE OF CONTENTS INTRODUCTION 1.1 OPERATION MODES INTRODUCTION 1.2 SAFETY & WARNINGS 1.3 PRODUCT OVERVIEW INSTALLATION INSTRUCTIONS 2.1 UNACCEPTABLE INSTALLATIONS 2.2 PACKING LIST 2.3 MOUNTING 2.3.1 SELECT MOUNTING LOCATION 2.3.2 MOUNTING 2.4 ELECTRICAL WIRING CONNECTION 2.4.1 BATTERY CONNECTION 2.4.2 ON-GRID &...
  • Page 3: Introduction

    GoodWe S-BP series bi-directional inverter is designed for both indoor and outdoor use, which could as GoodWe) strictly comply with related safety rules for product design and testing. Please read and be used with or without existing grid-tied inverter systems to store energy with batteries.
  • Page 4: Product Overview

    Usage and operation of the inverter must follow instructions in this user manual, otherwise the protection design might be useless and warranty for the inverter will be invalid. Do not open inverter cover or change any components without GoodWe’s authorization, otherwise the warranty commitment for the inverter will be invalid.
  • Page 5: Installation Instructions

    INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS 2.3 MOUNTING INSTALLATION INSTRUCTIONS 2.3.1 SELECT MOUNTING LOCATION For inverter’s protection and convenient maintenance, mounting location for inverter should be 2.1 UNACCEPTABLE INSTALLATIONS selected carefully based on the following rules: Please avoid the following installations, which will damage the system or the inverter. Rule 1.
  • Page 6: Mounting

    • For lithium battery (pack) the capacity should be 50Ah or larger. Lead acid batteries are not allowed Remember that this inverter is heavy! Please be careful when lifting out from the package. to use with GoodWe hybrid inverters without GoodWe's authority. Battery cable requirement as below. (Pic 8)
  • Page 7: On-Grid & Back-Up Connection

    2.4.2 ON-GRID & BACK-UP CONNECTION • FOR LEAD-ACID BATTERIES An external AC switch (≥40A for GW3600S-BP , ≥50A for GW 5000S-BP) is needed for On-Grid and Lead-Acid and other similar older-technology battery types require experienced and precise Back-Up connection to isolate from grid when necessary. Below are the requirements on AC switch use: design, installation and maintenance to work effectively.
  • Page 8: Ezmeter & Ct Connection

    1. For 3-phase EzMeter, L1/L2/L3 is connect to inverter side and L1’/L2’/L3’ connected to grid side of QU/PU curves etc. by special firmware. Please contact GoodWe after-sales for the special firmware and 2. To connect a 3-phase EzMeter from GoodWe, the external RJ45 plug from “To EzMeter” cable should adjust methods.
  • Page 9: Dred Connection

    'To Battery' Cable DRED is only for Australian and New Zealand installations, in compliance with Australian and New AC Breaker*4 Zealand safety requirements. And DRED device is not provided by GoodWe. Detailed connection of DRED device is shown below: Step 1...
  • Page 10: Manual Operation

    • Wi-Fi configuration is absolutely necessary for online monitoring and after-sales maintenance PREPARATION: Back-Up Loads 1. Inverter must be powered up with only PV power Back-Up 2. Need a router with available internet access to GoodWe portal www.goodwe-power.com RS485 Battery GoodWe S-BP Series Hybrid Inverter...
  • Page 11: Pv Master App Operation

    3.2 PV Master APP OPERATION PV Master is an external monitoring/ configuration Neutral & ground cable are not connected well on AC side or just application for GoodWe hybrid inverters, used on smart Relay Check Failure Self checking of relay fails...
  • Page 12 10V, it means the Neutral & ground cable are not connected well on AC side or restart inverter. Try to restart inverter, check if it still happens, if not, means it is just an occasional situation or contact GoodWe To Public Grid...
  • Page 13 3.An electrical short-cut happened on battery connection side. Or other reasons please contact from grid-tied inverter or other power source, thus sometimes when you see the system does not discharge GoodWe for details. when load power is high, which actually is because of grid-tied production is supporting load.
  • Page 14: Disclaimer

    [4]Make sure inverter is totally isolated from any DC or AC power before connectiong AC cable,page 10 there is any special condition when you cannot 100% follow the instructions, please contact GoodWe [5]Make sure S-BP and grid-tied inverters are totally isolated from AC and DC power before connecting for suggestions EzMeter &...
  • Page 15: Technical Parameters And Certificates

    [3] On condition of battery and PV power being enough Zref: [4] 4600 for VDE-AR-N 4105 and CEI 0-21, 5000 for other country [5] GW3600S-BP: 4050 for CEI 0-21, GW5000S-BP: 5100 for CEI 0-21, 4600 for VDE-AR-N 4105, RA=0,24 XA=j0,15 at 50Hz RN=0,16 XN=j0,10 at 50Hz.
  • Page 16 OTHERS OTHERS Appendix: Protection Category Definition Overvoltage Category Definition Category Ⅰ Applies to equipment connected to a circuit where measures have been taken to reduce transient overvoltage to a low level Applies to equipment not permanently connected to the installation. Examples are appliances, portables tools and other Category Ⅱ...