PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2,
ESC800-A1)
Installation Guide
Figure 10-3 Installing an antenna
Before installing the antenna, remove the plastic shell from the antenna base to
ensure magnetic adherence.
----End

10.2.3 BBU In-band Networking

Prerequisites
The SMU connects to the baseband unit (BBU) of the base transceiver station
(BTS) for in-band communication. The BTS is required to be later than GBSS12.0
and support in-band networking.
Procedure
Step 1 Install a communications cable.
1.
2.
Issue 02 (2021-09-28)
NO TICE
Connect one end of a cable to the RS485/RS232 port on the SMU.
Connect the other end to the MON1 or MON0 port on the BBU.
Copyright © Huawei Technologies Co., Ltd.
10 Installing Cables