Huawei LUNA2000-2.0MWH-2H 1 Quick Manual

Huawei LUNA2000-2.0MWH-2H 1 Quick Manual

On-grid utility-scale energy storage solution

Advertisement

Quick Links

On-Grid Utility-Scale Energy Storage Solution
Quick Guide (Based on 2.0MWH
and 1.0MWH Series ESS)
Issue
01
Date
2024-04-20
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LUNA2000-2.0MWH-2H 1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Huawei LUNA2000-2.0MWH-2H 1

  • Page 1 On-Grid Utility-Scale Energy Storage Solution Quick Guide (Based on 2.0MWH and 1.0MWH Series ESS) Issue Date 2024-04-20 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    Indicates a hazard with a medium level of risk which, if not avoided, could result in death or serious injury. Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 4: Change History

    Change History Changes between document issues are cumulative. The latest document issue contains all the changes made in earlier issues. Issue 01 (2024-04-20) This issue is used for first office application (FOA). Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 5: Table Of Contents

    5.1 Working Modes..................................39 5.2 Peak Shaving..................................49 5.3 Multi-mode Overlay................................50 6 System Power-Off......................... 52 A Reference Documents......................53 B List of Alarms Affecting Topology Identification............55 C Contact Information......................58 Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 6 On-Grid Utility-Scale Energy Storage Solution Quick Guide (Based on 2.0MWH and 1.0MWH Series ESS) Contents D Acronyms and Abbreviations..................... 60 Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 7: Solution Introduction

    1.1.1 ESS-Only System The ESS-only system is mainly used for peak staggering and peak shaving at the grid connection point through scheduled charge and discharge. Fixed-power charge and discharge without meters is supported. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 8: Low-Voltage Coupling Scenario

    ● LUNA2000-2.0MWH-2H 1 with the BOM numbers 01075958-016, 01075975-012, and 01075975-013 ● LUNA2000-2.0MWH-1H 1 with the BOM numbers 01075974-016 and 01075974-018 ● LUNA2000-1.0MWH-1H 1 with the BOM numbers 01075974-017 and 01075974-019 Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 9 Company (optional) Managemen t System (SmartPVMS Power Prepared by the customer distribution equipment Transformer The voltage level Prepared by the customer on the grid depends on the actual side grid voltage. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 10: Medium-Voltage Coupling Scenario

    On-Grid Utility-Scale Energy Storage Solution Quick Guide (Based on 2.0MWH and 1.0MWH Series ESS) 1 Solution Introduction 1.1.1.2 Medium-Voltage Coupling Scenario Figure 1-2 Networking architecture Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 11 IMD license and load the license by referring to License Management in the SmartLogger3000 User Manual . SmartModul SmartModule1000A01 Purchased from the Company. The SmartModule is used with the SmartLogger or SACU. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 12: Pv+Ess

    1.1.2 PV+ESS The PV+ESS system is mainly used for maximum PV self-consumption as well as peak staggering and peak shaving at the grid connection point. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 13: Low-Voltage Coupling Scenario

    ● LUNA2000-2.0MWH-2 H1 with the BOM numbers 01075958-016, 01075975-012, and 01075975-013 ● LUNA2000-2.0MWH-1 H1 with the BOM numbers 01075974-016 and 01075974-018 ● LUNA2000-1.0MWH-1 H1 with the BOM numbers 01075974-017 and 01075974-019 Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 14 Company (optional) Managemen t System (SmartPVMS Power Prepared by the customer distribution equipment Transformer The voltage level Prepared by the customer on the grid depends on the actual side grid voltage. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 15 SUN2000-29.9KTL-M3, ● SUN2000-600W-P actual SUN2000-30KTL-M3, ● MERC-1300W-P quantity SUN2000-36KTL-M3, of PV ● MERC-1100W-P SUN2000-40KTL-M3, modules SUN2000-33KTL-NH, and SUN2000-40KTL-NH support the SUN2000P. SUN2000-50KTL-M3, SUN2000-50KTL-ZHM3, and SUN2000-50KTL- NHM3 support only MERC-1300W-P or MERC-1100W-P. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 16 ● LUNA2000-2.0MWH-2 H1 with the BOM numbers 01075958-016, 01075975-012, and 01075975-013 ● LUNA2000-2.0MWH-1 H1 with the BOM numbers 01075974-016 and 01075974-018 ● LUNA2000-1.0MWH-1 H1 with the BOM numbers 01075974-017 and 01075974-019 Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 17 Company (optional) Managemen t System (SmartPVMS Power Prepared by the customer distribution equipment Transformer The voltage level Prepared by the customer on the grid depends on the actual side grid voltage. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 18: Medium-Voltage Coupling Scenario

    1 Solution Introduction Name Model Quantit Remarks Inverter ● SUN2000-250KTL-H3 ≤ 30 Purchased from the Company ● SUN2000-280KTL-H0 ● SUN2000-300KTL-H0 1.1.2.2 Medium-Voltage Coupling Scenario Figure 1-5 Network architecture (with C&I inverters) Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 19 IMD license and load the license by referring to License Management in the SmartLogger3000 User Manual . SmartModul SmartModule1000A01 Purchased from the Company. The SmartModule is used with the SmartLogger or SACU. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 20 Purchased from the Company ● SUN2000-29.9KTL-M3 ● SUN2000-30KTL-M3 ● SUN2000-36KTL-M3 ● SUN2000-40KTL-M3 ● SUN2000-50KTL-M3 ● SUN2000-50KTL- ZHM3 ● SUN2000-75KTL-M1 ● SUN2000-100KTL-M1 ● SUN2000-100KTL-M2 ● SUN2000-110KTL-M2 ● SUN2000-115KTL-M2 ● SUN2000-125KTL-M0 ● SUN2000-110KTL-M0 ● SUN2000-100KTL-M0 Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 21 ● MERC-1100W-P quantity SUN2000-36KTL-M3, of PV SUN2000-40KTL-M3, modules SUN2000-33KTL-NH, and SUN2000-40KTL-NH support the SUN2000P. SUN2000-50KTL-M3, SUN2000-50KTL-ZHM3, and SUN2000-50KTL- NHM3 support only MERC-1300W-P or MERC-1100W-P. Figure 1-6 Network architecture (with utility-scale inverters) Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 22 IMD license and load the license by referring to License Management in the SmartLogger3000 User Manual . SmartModul SmartModule1000A01 Purchased from the Company. The SmartModule is used with the SmartLogger or SACU. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 23: Communication Logic

    The PCSs communicate with the SACU over FE in ring topology. ● The PCSs communicate with each other over FE in ring topology. Maximum communication distance of the SACU: ● RS485: 1000 m Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 24 Figure 1-7 SACU+ESS FE star+PCS FE ring topology Typical Scenario 2: SACU+ESS Fiber Ring+PCS FE Ring Topology In this scenario, one array supports a maximum of six ESSs and 30 PCSs. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 25 Industrial-grade operating temperature range: –40°C to +75°C, or otherwise determined based on local conditions ● Wide voltage input range: 9–60 V DC ● Guide rail mounting and wall mounting; IP30 above Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 26: O&M Methods

    Reference Document Application Scenario SmartLogger A PC is connected to the Deployment and SmartLogger3000 User SmartLogger in the SACU commissioning Manual to manage the ESSs, PCSs, inverters, and meters in the array. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 27 Manual CMU of the ESS, and the a single device inverter to locally manage locally a single PCS, ESS, and ● Upgrading the inverter. software version of a single device locally Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 28: Installation And Cable Connections

    PCS on a support. If the PCS needs to be installed on a wall, you need to prepare M12x60 stainless steel expansion anchor bolts. Installing the inverter Installing the SACU Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 29 ● Preinstall nuts with the recommended torque of 27 N·m. ● After installing nuts, check that the torque is 27 N·m. Use a marker to mark the nuts after the torque is verified. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 30: Check And Preparation Before Power-On

    Step 5 Test the fire suppression system of the ESS. Remove foreign objects from the ESS, collect auxiliary materials, and take away flammable objects such as desiccants and cartons. Install batteries for the extinguishant control panel. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 31 Remove the reset device and visually check that the plunger of the solenoid valve is not activated. Figure 3-2 Resetting the plunger of the solenoid valve Install the solenoid valve. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 32 3 Check and Preparation Before Power-On WARNING For non-emergency manual operations, do not remove the safety pull ring. A safety pin is equipped only for certain models. Figure 3-3 Installing the solenoid valve ----End Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 33: System Power-On And Commissioning

    2. Turn on the single-phase input switch QF03 of the SACU. 3. Turn on the SmartPID switch QF01 of the SACU. 4. Turn on the three-phase input switch FU01 of the SACU. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 34 5FCB3. d. Turn on the PSU AC input switch 6FCB1. e. Turn on the DC input switches 7FCB1 and (optional) 7FCB2, exhaust fan controller Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 35: On-Grid Pv+Ess System

    2. Turn on the single-phase input switch QF03 of the SACU. 3. Turn on the SmartPID switch QF01 of the SACU. 4. Turn on the three-phase input switch FU01 of the SACU. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 36 5FCB3. d. Turn on the PSU AC input switch 6FCB1. e. Turn on the DC input switches 7FCB1 and (optional) 7FCB2, exhaust fan controller Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 37: Deployment And Commissioning

    4.2 Deployment and Commissioning 4.2.1 Preparations and WebUI Login The SmartLogger WebUI is used for power-on and commissioning. For details about the preparations and WebUI login, see the SmartLogger3000 User Manual. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 38: Preparations Before Deployment

    Clear the alarms that affect topology identification by referring to B List of Alarms Affecting Topology Identification, and then search for the devices. ----End 4.2.3 Commissioning Using the Deployment Wizard Step 1 Set basic parameters. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 39 Deployment Wizard. Otherwise, the system topology will not be updated. Step 3 After searching for devices, set the Microgrid compatibility, Grid connection state, and Grid Code based on the site requirements. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 40 (PT), set this parameter to 1. If the power meter has a PT, set this parameter based on the actual PT ratio of the power meter. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 41 Figure 4-4 Connecting to power meters Step 5 (Optional) Connect to environment monitoring instruments (EMIs). Figure 4-5 Connecting to EMIs Step 6 Set battery control parameters. Figure 4-6 Setting battery control parameters Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 42 XX:XX is displayed, you are advised to click Confirm and set Detection start time to the optimal time. Step 7 Connect to a Huawei network management system (NMS). Set related parameters by referring to "Setting Parameters for Connecting to the Management System"...
  • Page 43 Quick Guide (Based on 2.0MWH and 1.0MWH Series ESS) 4 System Power-On and Commissioning Figure 4-7 Connecting to a Huawei NMS Step 8 Connect to a third-party NMS. Select IEC104 or Modbus TCP based on the protocol used by the SmartLogger to connect to the third-party NMS.
  • Page 44 NO TICE Do not click Batch configurations shown in the following figure to send the array startup/shutdown command, because this will affect the phase sequence check. Figure 4-10 Completing the configuration ----End Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 45: Ess Commissioning

    Figure 5-1 Working modes No Control The SmartLogger directly delivers the external scheduling power limit. No other power scheduling control is performed. The power is automatically controlled by the device. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 46 Example of maximum self-consumption (ESS capacity: 800 kWh/400 kW) Figure 5-2 Example of maximum self-consumption Table 5-1 Running parameters for maximum self-consumption Parameter Description Working mode Set this parameter to Maximum self-consumption. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 47 During off-peak hours, the grid supplies power to charge the ESS. During peak hours, the ESS discharges to supply power to loads. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 48 In some countries, the grid is not allowed to charge the ESS. In this case, this mode cannot be used. ● Example of TOU (ESS capacity: 800 kWh/400 kW; Preferred use of surplus PV power is set to Charge) Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 49 Quick Guide (Based on 2.0MWH and 1.0MWH Series ESS) 5 ESS Commissioning Figure 5-3 Example of TOU Table 5-2 Running parameters for TOU Parameter Description Working mode Set this parameter to TOU. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 50 SmartLogger are used. Generally, the adjustment period and step are calculated based on the number of devices connected to the port and device specifications. ● Disable: Use this value based on site requirements. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 51 ● PV energy supply priority: ● Load power consumption load > power grid > ESS priority: PV > ESS > power grid ● Load power consumption priority: PV > ESS > power grid Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 52 In some countries, the grid is not allowed to charge the ESS. Therefore, this mode cannot be used. Table 5-4 Running parameters for TOU (fixed power) Parameter Description Working mode Set this parameter to TOU (fixed power). Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 53 PV energy is used to charge the ESS. Table 5-5 Running parameters in each battery control working mode Parameter Description Working mode Set this parameter to Charge/Discharge based on grid dispatch. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 54 Charge/Discharge Mon. through Sun. in the Repeat box. The buttons are blue by default, indicating being selected. After you click Charge/Discharge it, the button turns gray. power (kW) Repeat Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 55: Peak Shaving

    Specifies the active power limit of limit when the inverter when the export power meter +import meter communication is fails abnormal. You can manually change the active power percentage of the inverter as required. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 56: Multi-Mode Overlay

    Step 1 Choose Settings > Battery Control > Battery Control and set Working mode to TOU. Step 2 Set Preferred use of surplus PV power to Charge. For details about how to set other parameters, see TOU. Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 57 Step 2 Set Preferred use of surplus PV power to Fed to grid. For details about how to set other parameters, see TOU. Step 3 Choose Settings > Battery Control > Peak Shaving and set the parameters by referring to 5.2 Peak Shaving. ----End Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 58: System Power-Off

    4.1 Device Power- in the reverse order. NO TE To prevent local operations on switches during subsequent power-on, you are advised not to turn off the auxiliary power switches. ----End Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 59: Reference Documents

    LUNA2000-200KTL-H1 Smart Power Control System User Manual ● LUNA2000-200KTL-H1 Smart Power Control System Quick Guide SACU ● SmartACU2000D Smart Array Controller User Manual (With PID Modules) ● SmartACU2000D Smart Array Controller Quick Guide (with PID Modules) Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 60 ● SUN2000-(75KTL-M1, 100KTL-M2, 110KTL-M2, 115KTL- M2) Quick Guide SmartLogger SmartLogger3000 User Manual FusionSolar FusionSolar App User Manual SmartPVMS SmartPVMS 24.4.0 FusionSolar SmartPVMS User Manual DTSU666-HW DTSU666-HW Smart Power Sensor Quick Guide Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 61: B List Of Alarms Affecting Topology Identification

    Bus Side Overvoltage on Rack Controller 3020 Bus Side Reverse Polarity on Rack Controller 3021 Insulation Resistance of Rack Controller Abnormal 3022 Rack Controller Temperature High 3023 Battery Terminal Overtemperature on Rack Controller Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 62 Connection of Rack Controller Abnormal 3044 Battery Pack Overcurrent 3045 Battery Pack Temperature High 3046 Battery Pack Temperature Low 3047 Battery Pack Undervoltage 3052 External DC Auxiliary Power Supply of Rack Controller Fault Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 63 Control Malfunction 3849 Air Exhaust Malfunction 1, 2 3850 Combustible Gas Detection Malfunction 3856 Battery Fault Protection 1, 2 3858 48 V DC Auxiliary Power Supply Faulty 3859 Forced Dehumidification Started Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 64: Contact Information

    To ensure faster and better services, we kindly request your assistance in providing the following information: ● Model ● Serial number (SN) ● Software version ● Alarm ID or name ● Brief description of the fault symptom Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 65 Quick Guide (Based on 2.0MWH and 1.0MWH Series ESS) C Contact Information NO TE EU Representative Information: Huawei Technologies Hungary Kft. Add.: HU-1133 Budapest, Váci út 116-118., 1. Building, 6. floor. Email: hungary.reception@huawei.com Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 66: Acronyms And Abbreviations

    D Acronyms and Abbreviations Acronyms and Abbreviations central monitoring unit Smart Rack Controller energy storage rack (battery rack) fast Ethernet power control system power supply unit RSTP Rapid Spanning Tree Protocol Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 67 Quick Guide (Based on 2.0MWH and 1.0MWH Series ESS) D Acronyms and Abbreviations SACU Smart Array Controller state of charge state of health SPPC Smart Power Plant Controller Smart Transformer Station Issue 01 (2024-04-20) Copyright © Huawei Technologies Co., Ltd.

Table of Contents

Save PDF