Step 5. Slowly raise the server off the pallet until it clears the pallet cushions.

Figure 2-6 Raising the Server Off the Pallet Cushions

Step 6. Carefully roll the lifter and server away from the pallet. Do not raise the server any higher than
necessary when moving it over to the rack.
Step 7. Follow the HP J1528A Rack Integration Kit Installation Guide to complete these steps:
Mounting the server to the slides
Installing the cable management arm (CMA)
Installing the interlock device assembly (if two servers are in the same cabinet)