Connection Of The " Pentair Vsf " Filter Pump; Connection Of The Heat Pump Power Supply (If Installed) - Pentair E-Box SOLEO Connect Installation And Operation Manual

Table of Contents

Advertisement

4.5.3
Connection of the " PENTAIR VSF " filter pump
The connection of the supply phase, the neutral and the earth must be made through the
connection terminal block according to terminals 3 and 4 (for the earth connection: proceed to the
connection on the dedicated terminal block).
The connection of the control cable must be carried out on the terminal blocks 47 and 48.
4.5.4

Connection of the heat pump power supply (if installed)

The connection of the supply phase, the neutral and the earth must be made through the
connection terminal block according to terminals 1 and 2 (for the earth connection: proceed to the
connection on the dedicated terminal block).
The power consumption of the heat pump shall not exceed 20 A in single phase.
The control of the operation of the heat pump must be connected to terminals 21-22 (refer to the
instructions for the heat pump used).
The connection of the BUS control cable for a Pentair heat pump (Invertemp) must be carried out
on the RS-485 terminal blocks present in the SPEEDEO Connect, and do not use terminal blocks
21-22.
Info
The connection of the RS-485 control cables (IntelliFlo, InverTemp) must be made in the
SPEEDEO Connect on the RS-485 connectors.
Ref. SB-CU-IMP-069EB / A - 12.05.2023
Installation and Operation Guide Version E-Box SOLEO Connect - Installation
IntelliFlo steering, Pentair PAC,
Dedicated terminal block (+)/(-)
Inside the Speedeo Connect box
35 / 64

Advertisement

Table of Contents
loading

Table of Contents