Pentair E-Box SOLEO Connect Installation And Operation Manual page 33

Table of Contents

Advertisement

4.5.2.1
Terminal block 1: High voltage connection (230V)
Positions and markings of the connection terminals:
N-L1
E-Box Main Power Supply (230 V)
1-2
Connection of the heat pump power supply (230 V 20A)
3-4
Variable Speed Pump Supply Connection (230 V 15A)
5-6
Connecting the Pool Automatic Shutter Power Supply (230 V 16A)
7-8
Connecting the Single Speed Filter Pump Supply (4/6 3A)
9-10
Start (230V 8A) Robot or other. Allocatable Output 1 of SPEEDEO Connect
11-12
Connection of the metering pump power supply connection for pH control (230 V 1A)
13-14
Connection of the supply of the metering pump for chlorine regulation or of an
electrolyser (230 V 2A)
15-16
Start (230V 6A) Assignable Output 2 of theSPEEDEO Connect
17-18
Dry contact subjected to the operation of the filtration function (max 5A)
In order to operate the outputs correctly, it is necessary to configure them through the SPEEDEO
Connect, through the subject menus.
Ref. SB-CU-IMP-069EB / A - 12.05.2023
Installation and Operation Guide Version E-Box SOLEO Connect - Installation