Connections - Pentair E-Box SOLEO Connect Installation And Operation Manual

Table of Contents

Advertisement

Installation and Operation Guide Version E-Box SOLEO Connect - Installation
4.6.4

Connections

4.6.4.1
Soleo Connections
Connection of measurement probes:
• pH
• RedOx Chlorine
• Water temperature
• Analytical chamber flow switch
4.6.4.2
Probe connections (pH + RedOx + temperature)
1. Unscrew the cable gland completely: be careful not to drop the black flexible seal.
2. Pass the 4 cables through the nut and the cable gland.
3. Connect each terminal according to the indication under each terminal block.
4. Screw with a 2.5 mm slot screwdriver to 0.5-0.6 N.m.
5. Tighten the cable gland tightly by hand.
42 / 64
Quick connection to the E-Box
Ref. SB-CU-IMP-069EB / A - 12.05.2023

Advertisement

Table of Contents
loading

Table of Contents