Installation and Operation Guide Version E-Box SOLEO Connect - Installation
4.5.2.2
Terminal block 2: Low voltage connection (12-24 V)
Positions and markings of the connection terminals:
19-20
Dry contact connection (max 8A) for the control of a light network (through Output 3 of
the SPEEDEO Connect to be configured in the attributable menu).
21-22
Control of a dry contact through Output 2 of the SPEEDEOConnect (the same
parameters as the output of Output 2, 6A Max)
23-24
Control of a dry contact for a robot blower through Output 2 of SPEEDEO Connect (the
same parameters as the output of Output 2, 6A Max)
25-32
Connection of swimming pool projectors (12 V/50 W unit)
Prohibition
Never supply voltage (Neutral + Phase) to the outputs of dry contacts under penalty of
cancellation of the warranty.
In order to operate the outputs correctly, it is necessary to configure them on the website.
These settings can be partly carried out on the Intellipool interface, through the related menus.
34 / 64
Ref. SB-CU-IMP-069EB / A - 12.05.2023