Pentair E-Box SOLEO Connect Installation And Operation Manual page 32

Table of Contents

Advertisement

Installation and Operation Guide Version E-Box SOLEO Connect - Installation
1. High voltage connection (230V)
1
Terminal block 1: High voltage
connection (230V) [
230V minimum power compatible cables
5 mm
Minimum dry contact compatible cables
5 mm
32 / 64
Page 33]
= R02V (3x1.5mm² min)
= R02V (3x1.5mm² min)
2. Low voltage connection (12/24V)
2
Terminal block 2: Low voltage
connection (12-24 V) [
Ref. SB-CU-IMP-069EB / A - 12.05.2023
Page 34]

Advertisement

Table of Contents
loading

Table of Contents