Softener Preparation

Softener Tank Preparation

Water Pressure: A minimum of 20 pounds of water pressure is required for the regenera-
tion valve to operate effectively.
Electrical Facilities: An uninterrupted alternating current (AC) supply is required. Note:
Other voltages are available. Please make sure your voltage supply is compatible with
your unit before installation.
Existing Plumbing: Condition of existing plumbing should be free from lime and iron
buildup. Piping that is built up heavily with lime and/or iron should be replaced.
Location of Tank and Drain: The resin tank should be located close to a drain to prevent
air breaks and back flow.
Caution: Water pressure is not to exceed 80 psi, water temperature is not to exceed
110°F (43°C), and the unit cannot be subjected to freezing conditions.

Resin Installation

1.
Remove the tank from the carton.
2.
Verify the riser tube is centered in the bottom of the tank. There is an indentation in
the bottom of the tank that will allow the distributor tube to be centered. A flashlight
may be needed to verify the tube is in the center of the tank.
3.
Place a piece of duct tape over the riser tube so no media enters the riser while
filling.
Need help? 1.800.390.5936
14
www.uswatersystems.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Synergy 9000 and is the answer not in the manual?

Table of Contents