Installing The Industrial Managed Poe+ Switch; Installation Steps - Planet IGS-10020HPT-U User Manual

Industrial 8-port 10/100/1000t 802.3at poe + 2-port 1g/2.5g sfp managed switch with usb console
Table of Contents

Advertisement

2.2 Installing the Industrial Managed PoE+ Switch

This section describes how to install your Industrial Managed PoE+ Switch and make connections to the Industrial Managed
PoE+ Switch. Please read the following topics and perform the procedures in the order being presented. To install your
Industrial Managed PoE+ Switch on a desktop or shelf, simply complete the following steps.
In this paragraph, we will describe how to install the Industrial Managed PoE+ Switch and the installation points attended to it.

2.2.1 Installation Steps

1.
Unpack the Industrial Managed PoE+ Switch
2.
Check if the DIN-Rail is screwed on the Industrial Managed PoE+ Switch or
Industrial Managed PoE+ Switch, please refer to DIN-rail Mounting section for DIN-rail installation. If users want to
wall-mount the Industrial Managed PoE+ Switch, please refer to the Wall Mount Plate Mounting section for wall-mount
plate installation.
3.
To hang the Industrial Managed PoE+ Switch on the DIN-rail track or wall.
4.
Power on the Industrial Managed PoE+
information about how to wire the power. The power LED on the Industrial Managed PoE+ Switch will light up. Please
refer to the LED Indicators section for indication of LED lights.
5.
Prepare the twisted-pair, straight-through Category 5 cable for Ethernet
6.
Insert one side of RJ45 cable (category 5) into the Industrial Managed PoE+ Switch Ethernet port
the other side to the network device's Ethernet port (RJ45 port), e.g., Switch PC or Server. The UTP port (RJ45) LED on
the Industrial Managed PoE+ Switch will light up when the cable is connected with the network device. Please refer to
the LED Indicators section for LED light indication.
Make sure that the connected network devices support MDI/MDI-X. If it does not support,
use the crossover Category 5 cable.
7.
When all connections are set and all LED lights show normal, the installation is completed.
Switch. Please refer to the Wiring the Power Inputs section for knowing the
32
User's Manual of IGS-10020HPT-U
not. If the DIN-Rail is not screwed on the
connection.
(RJ45 port) while

Advertisement

Table of Contents
loading

Table of Contents