Installing The Industrial Managed Switch; Installation Steps - Planet IGS-4215-16T2S User Manual

Industrial l2/l4 16-port 10/100/1000t+2-port 100/1000x sfp managed switch
Hide thumbs Also See for IGS-4215-16T2S:
Table of Contents

Advertisement

2.2 Installing the Industrial Managed Switch

This section describes how to install your Industrial Managed Switch and make connections to the Industrial Managed
Switch. Please read the following topics and perform the procedures in the order being presented. To install your Industrial
Managed Switch on a desktop or shelf, simply complete the following steps.
In this paragraph, we will describe how to install the Industrial Managed Switch and the installation points attended to it.

2.2.1 Installation Steps

1.
Unpack the Industrial Managed Switch
2.
Check if the DIN-rail bracket is screwed on the Industrial Managed Switch or
on the Industrial Managed Switch, please refer to DIN-rail Mounting section for DIN-rail installation. If users want to
wall-mount the Industrial Managed Switch, please refer to the Wall-mount Plate Mounting section for wall-mount plate
installation.
3.
To hang the Industrial Managed Switch on the DIN-rail track or wall.
4.
Power on the Industrial Managed
The power LED on the Industrial Managed Switch will light up. Please refer to the LED Indicators section for indication
of LED lights.
5.
Prepare the twisted-pair, straight-through Category 5 cable for Ethernet
6.
Insert one side of RJ45 cable (category 5) into the Industrial Managed Switch Ethernet port
other side to the network device's Ethernet port (RJ45 port), e.g., Switch PC or Server. The UTP port (RJ45) LED on the
Industrial Managed Switch will light up when the cable is connected with the network device. Please refer to the LED
Indicators section for LED light indication.
Make sure that the connected network devices support MDI/MDI-X. If it does not, use the
crossover Category 5 cable.
7.
When all connections are set and all LED lights show normal, the installation is completed.
Switch. Please refer to the Wiring the Power Inputs section for how to wire the power.
30
User's Manual of IGS-4215-16T2S
not. If the DIN rail bracket is not screwed
connection.
(RJ45 port) while the

Advertisement

Table of Contents
loading

Table of Contents