COMMUNICATION
Installing Communication Options and Control Terminals
To install the communication options and control terminals:
1.
2.
3.
4.
90
EATON Powerware
Install the appropriate X-Slot card and/or necessary cable(s) (see
Figure 47 and Figure 48).
Figure 48. Installing Communication Cables
Connect the cables to the appropriate location.
See "Communication Options" on page 91 or "Control Terminals"
on page 94 for detailed information.
Route and tie the cable(s) out of the way.
Continue to "Operation" on page 71 to start up the UPS.
®
BladeUPS
®
(12 kVA) User's Guide
S