Installing Communication Options And Control Terminals - Eaton Powerware BladeUPS User Manual

12 kva
Hide thumbs Also See for Powerware BladeUPS:
Table of Contents

Advertisement

COMMUNICATION

Installing Communication Options and Control Terminals

To install the communication options and control terminals:
1.
2.
3.
4.
90
EATON Powerware
Install the appropriate X-Slot card and/or necessary cable(s) (see
Figure 47 and Figure 48).
Figure 48. Installing Communication Cables
Connect the cables to the appropriate location.
See "Communication Options" on page 91 or "Control Terminals"
on page 94 for detailed information.
Route and tie the cable(s) out of the way.
Continue to "Operation" on page 71 to start up the UPS.
®
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 3 www.powerware.com

Advertisement

Table of Contents
loading

Table of Contents