Download Print this page

Hyundai 110D-7E Operating Manual page 335

Advertisement

3)
DISASSEMBLY
MOUNTING FLANGE SECTION
(1)
Loosen and remove the assembling
bolts(3) with washers(4) from the
mounting flange.
(2)
Remove the square-ring(13) from the
mounting flange(5).
Replace the square-ring if damaged.
(3)
Remove the snap-ring(1) with proper
tool(Only when it is needed to replace
shaft seal.)
(4)
Remove the shaft seals(2) taking care not
to give any damage on the surface of
shaft hole(Only when it is needed to
replace shaft seal).
Replace the shaft seal if damaged.
FRONT WORKING SECTION
(1)
Remove the pressure plate(9) with related
parts(7, 8) from the working section and
examine if carefully.
(2)
Remove the drive gear(10) and driven
gear(11) as straight as possible.
(3)
Remove the pressure plate(9) with related
parts(7, 8) from the working section and
examine it carefully.
Take great care not to strike the gears
against hard surfaces which could
damage the gear teeth. Keep the two
shafts together.
5
3
4
5
2
1
9
8
7
9
8
7
10
11
6-38
13
100D7PMP01
100D7PMP02
14
100D7PMP03
14
7
8
100D7PMP04

Advertisement

loading

This manual is also suitable for:

130d-7e140d-7e160d-7e