⑮
Install two adjusting screws.
(S)Adjusting screws
Screens(1) are to be flush mounted into
the bores of the intermediate sheet, see
arrows.
Observe the installation position-the
screens are showing upwards(to the duct
plate).
Put on the intermediate sheet(1)
※
Screens(2) must show upwards.
Put on the duct plate(1) and tighten it
equally with torx screw(2).
※
Tightening torque - - - - - - - - - - - - - M
(S)Socket spanner TX-27 5873 042 002
5870 204 063
· m
=0.97kg
A
3-111
S
1
1
1
D507TM228
1
D507TM229
2
D507TM230
2
D507TM231