Download Print this page

Hyundai 110D-7E Operating Manual page 144

Advertisement

2)
ENGINE CONNECTION, PRESSURE OIL PUMP AND INSTALLATION OF THE CLUTCHES
Install all bearing outer rings into the bearing bores of both transmission housing sections.
Should contrary to the recommendations the taper roller bearing of the clutches as well as of the
input not be replaced, the assignment(bearing inner and outer rings) has to be kept at least .
Mark the bearing inner and bearing outer rings to each other accordingly.
(1)
T
T
ransmission housing front section
AN = Input
KV = Clutch - Forward
KR = Clutch - Reverse
K1 = Clutch - 1st gear
K2 = Clutch - 2nd gear
K3 = Clutch - 3rd gear
(2)
Transmission housing rear section
Put the bearing outer rings with
assembly grease into the bearing bores
Install the pipe(system pressure from the
electro-hydraulic control to the respective
clutch).
The pipes are to be installed in the
following sequence:
1 = Pipe
2 = Pipe
3 = Pipe
4 = Pipe
5 = Pipe
Tightening torque - - - - - - - - - - - - - - - - M
Install the holding segment(6)
Tightening torque(M8/8.8) - - M
3
KV
KR
1
K2
K1
K3
· m
=4.3kg
A
=2.3kg · m
A
3-96
KV
KR
K1
AN
K2
K3
2
5
4
AN
K2
K3
D507TM171
KV
KR
K1
D507TM172
6
D507TM173

Advertisement

loading

This manual is also suitable for:

130d-7e140d-7e160d-7e