Appendix 3 Index - Mitsubishi Electric FR-E720-0.1KNC Instruction Manual

Table of Contents

Advertisement

Appendix 3 Index

Numerics
15-speed selection (combination with three speeds RL, RM,
RH)(REX signal) ...............................................................130, 163
24V external power supply operation (EV signal) .........23, 167
24V external power supply operation (EV).....................23, 237
A
Acceleration time, deceleration time setting (Pr. 7, Pr. 8, Pr.
20, Pr. 21, Pr. 44, Pr. 45) ........................................................135
Acceleration/deceleration pattern (Pr. 29) ............................139
Actual Operation Time .............................................................176
Advanced magnetic flux control (Pr. 71, Pr. 80, Pr. 81, Pr. 89,
Pr. 800).......................................................................................114
Alarm output (LF signal) ..................................................167, 213
Applied motor (Pr. 71, Pr. 450)...............................................144
Automatic restart after instantaneous power failure/flying start
(Pr. 57, Pr. 58, Pr. 96, Pr. 162, Pr. 165, Pr. 298, Pr. 299, Pr.
611).............................................................................................180
Avoid mechanical resonance points (frequency jumps) (Pr. 31
to Pr. 36) ....................................................................................125
B
Base frequency, voltage (Pr. 3, Pr. 19, Pr. 47)....................126
Basic operation (factory setting)...............................................81
Brake opening completion signal (BRI signal) .............160, 163
Brake opening request (BOF signal) .............................160, 167
Brake sequence fault (E.MB4 to 7)................................160, 242
Brake sequence function (Pr. 278 to Pr. 283, Pr. 292).......160
Brake transistor alarm detection (E.BE) ...............................240
C
Cables and wiring length ...........................................................17
CC-Link communication reset selection (Pr.349)................110
CC-Link communication setting (Pr.541 to Pr.544).............105
CC-Link communication specifications ...................................48
CC-Link Ver. 1.10 .......................................................................48
CC-Link Ver. 2.............................................................................48
Change the control method (Pr. 80, Pr. 81, Pr. 800) ..........112
Change the parameter setting value .......................................82
Checking the inverter and converter modules .....................254
Cleaning .....................................................................................255
Communication EEPROM write selection (Pr. 342) ...........110
Communication option fault (E.OP1).....................................240
Communication stops during operation ..................................77
Connecting the 24V external power supply............................23
Connection cable and plug .......................................................51
Connection of a dedicated external brake resistor (MRS type,
MYS type, FR-ABR) (0.4K or higher) ......................................26
Connection of CC-Link dedicated cable .................................52
Connection of several inverters................................................50
Connection of the brake unit (FR-BU2)...................................28
Connection of the DC reactor (FR-HEL).................................29
Control circuit terminal ...............................................................20
Converter output voltage .........................................................176
Converter output voltage peak value.....................................176
Cooling fan operation selection (Pr. 244) .............................213
Cooling system types for inverter panel..................................10
CPU error (E. 5, E. 6, E. 7, E.CPU).......................................241
276
Cumulative energization time................................................. 176
Cumulative power .................................................................... 176
Cumulative power 2 ................................................................. 176
Current average value monitor signal (Pr. 555 to Pr. 557) 218
Current average value monitor signal (Y93 signal) .... 167, 218
D
Daily and periodic inspection.................................................. 253
Daily inspection ........................................................................ 252
DC injection brake (Pr. 10 to Pr. 12) ..................................... 154
Details of remote input and output signals............................. 60
Details of remote register.......................................................... 62
Detection of output frequency
(SU, FU signal, Pr. 41 to Pr. 43) ............................................ 171
Display of the life of the inverter parts
(Pr. 255 to Pr. 259) .......................................................... 214, 254
Droop control (Pr. 286, Pr. 287)............................................. 210
During PID control activated (PID signal)..................... 167, 203
During retry (Y64 signal) ................................................. 167, 188
E
Earth (ground) fault detection at start (Pr. 249)................... 190
Electronic thermal O/L relay pre-alarm (TH)................ 142, 236
Electronic thermal O/L relay pre-alarm (THP signal).. 142, 167
Electronic Thermal Relay Function Load Factor................. 176
Extended parameter display and user group function (Pr. 160,
Pr. 172 to Pr. 174).................................................................... 197
F
Fan alarm (FN) ................................................................. 213, 237
Fan fault output (FAN signal) ......................................... 167, 213
Fault or alarm indication.................................................. 176, 229
Fault output (ALM signal)................................................ 167, 170
Fault output 3 (power-OFF signal) (Y91 signal) .......... 167, 170
Faults history (E.---) ................................................................. 229
Fin overheat (E.FIN) ................................................................ 239
Forward rotation signal (STF signal)..................................... 165
Free parameter (Pr. 888, Pr. 889) ......................................... 222
Frequency setting value .......................................................... 176
Front cover .................................................................................... 5
Function block diagram ............................................................. 54
G
General-purpose magnetic flux vector control (Pr. 71, Pr. 80,
Pr. 81, Pr. 800) ......................................................................... 117
H
Harmonic suppression guideline in Japan ............................. 37
Heatsink overheat pre-alarm (FIN signal) .................... 167, 239
High speed operation command (RH signal)............... 130, 163
I
I/O signal when CC-Link Ver.1 one station (FR-E500 series
compatible) is occupied (Pr. 544 = 0) ..................................... 56
I/O signal when CC-Link Ver.1 one station is occupied (Pr.
544 = "1")..................................................................................... 57
I/O signal when CC-Link Ver.2 double setting is selected (Pr.
544 = "12")................................................................................... 57
I/O signal when CC-Link Ver.2 octuple setting is selected (Pr.

Advertisement

Table of Contents
loading

Table of Contents