2
Inspection and Installation
♦ Verifying the Shipment
♦ Instrument Size Introduction
♦ Connecting the Power Cord
♦ Connecting the Device Under Test (DUT)
♦ Remote Interface Connection
2.1 Verifying the Shipment
Unpack the box and check the contents before operating the instrument. If
wrong items have been delivered, if items are missing, or if there is a defect with
the appearance of the items, contact the dealer from which you purchased the
instrument immediately.
The package contents include:
Item
High power Program-
mable DC Power
Supply
Power cord
USB communication
cable
Ex-factory Test
Report
Qty.
x1
x1
x1
x1
Upon verification of the shipment, keep the package and relevant contents
thereof in a safe place. When returning the instrument for warranty service or
repair, the specified packing requirements shall be met.
Copyright © Itech Electronic Co., Ltd.
Inspection and Installation
Model
Remarks
IT-M3900D
For the specific models in-
Series
cluded in this series, refer
to
1.1 Brief
-
Depending on the instru-
ment model.
For details, see
necting the Power
-
This accessory is se-
lected when the USB in-
terface is used for starting
up remote operation.
-
It contains the test report
and calibration report of
the instrument before
delivery.
Introduction.
2.3 Con-
Cord.
18
Need help?
Do you have a question about the IT-M3900D Series and is the answer not in the manual?
Questions and answers